Tips to Prepare For Your Next Construction Project

construction projectSet Your Commercial Build Up for Success

Launching a construction project, whether it’s a tenant buildout, capital improvement, or facility expansion, starts long before the first hammer swings. From scope development to permits and budgeting, thoughtful preparation can mean the difference between a smooth project and one plagued with delays and surprises.

In this guide, we’ll break down practical, proven tips to help property owners, facility managers, and project stakeholders prepare for a successful construction project from day one.

1. Define Clear Goals for the Project

The most successful construction projects begin with clarity. Before hiring contractors or pulling permits, take time to understand the “why” behind your build. Ask:

  • What problem are we solving?
  • What functions does this space need to serve?
  • What are the long-term goals for this property?

When your project objectives are clearly defined, they guide every decision from material choices to scheduling priorities. Whether you’re modernizing a medical facility or improving infrastructure for public use, setting clear goals helps your team stay aligned through each phase.

 

2. Get Stakeholders Aligned Early

Construction projects are team efforts. From architects and engineers to property owners, city inspectors, and end users, there are a lot of voices in the room.

The earlier you can get key stakeholders to the table, the better. This helps:

  • Prevent scope changes mid-project
  • Reduce miscommunication and rework
  • Keep everyone informed about budget, timeline, and responsibilities

Consider hosting a kickoff meeting to establish expectations, communication channels, and key decision-makers. If you’re working with a general contractor, loop them in as early as possible so they can provide critical input during planning and design phases.

3. Understand the Timeline

Commercial construction projects take time, and not just the time it takes to build. Before breaking ground, consider:

  • Design and architecture timelines
  • Permitting and approval processes
  • Procurement lead times for materials
  • Scheduling availability for contractors and subcontractors

It’s not uncommon for larger projects to require months of preparation before a shovel hits the ground. Understanding your ideal (and realistic) timeline early on helps prevent frustration and gives your project team the bandwidth to do things right.

4. Set a Realistic Budget 

Budgeting for a construction project isn’t just about cost per square foot. There are plenty of less-visible expenses that can impact your bottom line:

  • Permit and inspection fees
  • Utility relocation
  • Temporary fencing or site security
  • Unexpected repairs or code compliance updates
  • Change orders due to design revisions

Adding a contingency buffer of 10-15% of the total budget gives you room to respond to the unexpected without derailing the project. And keeping your contractor in the loop early allows for more accurate budgeting based on market rates and local conditions.

5. Know the Permitting and Regulatory Landscape

In Michigan and many other states, commercial construction projects require a variety of permits and code compliance checks. Depending on your scope, that may include:

  • Zoning approvals
  • Building permits
  • Environmental or stormwater permits
  • ADA compliance reviews

Permitting timelines vary widely based on location, season, and project complexity. One permit delay can impact multiple trades and subcontractors, so it’s smart to get familiar with what your municipality requires.

The Michigan Department of Licensing and Regulatory Affairs is a helpful place to start for understanding state-level requirements.

6. Prepare the Site

If you already own the property, site readiness is another key consideration. This includes:

  • Utility markouts and locates
  • Demolition or abatement (if applicable)
  • Soil testing or environmental assessments
  • Access planning for equipment and materials

Clearing these hurdles in advance allows construction to move faster and with fewer surprises. In some cases, your contractor can assist with early site planning and coordination with local utility providers or geotechnical engineers.

7. Think About Long-Term Maintenance

While it’s easy to focus on what you need now, smart construction planning should also look to the future.

When selecting finishes, mechanical systems, and layouts, ask:

  • Will this material hold up in a high-traffic space?
  • Is this system easy to maintain or service?
  • How adaptable is this space if needs change later?

A little foresight today can save significant costs and headaches in the long term. Your general contractor or construction manager can often suggest cost-effective materials and configurations that reduce long-term maintenance or energy costs.

8. Communicate Throughout the Process

Even with a solid plan in place, every construction project has moving parts. Clear and consistent communication is the glue that holds it together.

Use tools like:

  • Weekly project status meetings
  • Shared cloud folders for drawings and documents
  • Centralized points of contact for approvals

When everyone is informed and involved, decisions can be made faster and small issues are less likely to spiral into big problems. Communication is especially critical during site mobilization, project handoff, and punch list closeouts.

9. Plan for Post-Construction

Don’t let your planning stop at the final inspection. Preparing for closeout can make life easier when it’s time to move in, especially for commercial spaces.

Think about:

  • Operations & Maintenance (O&M) manuals
  • Training for facility teams
  • Warranties and service agreements
  • Final inspection walkthroughs and documentation

A well-executed project closeout ensures a smoother transition and fewer lingering questions once construction wraps.

Final Thoughts

Preparing for a construction project takes more than a vision; it takes strategy, alignment, and proactive planning. From early budgeting to stakeholder collaboration and regulatory prep, these steps help set your project up for success before construction begins.

At Clement Construction, we’re here to support commercial property owners and organizations at every phase from pre-construction consulting to final walkthroughs. If you’re planning a project and want a trusted partner to help navigate the process, we’d be happy to talk.

Related Posts

Text Widget

A wonderful serenity has taken possession of my entire soul, like these sweet mornings of spring which I enjoy with my whole heart. I am alone, and feel the charm of existence.

Recent Articles

building security
July 16, 2025
Temporary Building Security 101: Quick Fixes After a Fire, Flood, or Break-In
contractor’s credentials
July 2, 2025
Verifying a Contractor’s Credentials Could Save You Thousands
construction project
June 24, 2025
How to Prepare for Your Next Commercial Construction Project

Clement Construction is a General Contractor that has built their reputation on quality and trusted relationships.


4545 Clawson Tank Dr.
Clarkston, MI 48346


T. 248-666-7779
F. 248-666-7773
E. office@clement.us